Applications
Each application below uses the same compound and method — drill, mix, pour — adapted to the material and constraints of the job.
Drill a standard pattern, mix Crackstone with water, and pour.
A single drilled hole or short row splits the boulder into haul-ready sections.
Gradual pressure build follows the drilled line, separating saleable blocks.
Reduces micro-fracturing that downgrades finished slabs.
Cracks concrete from drilled holes with minimal dust and noise.
Break rock with drill rigs already on site and keep digging.
Tell us about your rock or concrete removal project and our technical team will recommend a hole pattern, quantity, and timeline.